UH-20261002-615H

#1160 - Willmar · 10/02/2026 at 9:36 AM · Kandiyohi and 4th intersection NE corner

OpenGasAt fault: No
Claim statusOpenRequestedNot recordedSettledNot settledOffice sign-in to update
1

Job & timing

Job number
#1160 - Willmar
Date of damage
10/02/2026
Time of damage
9:36 AM
Form filled out
10/05/2026
Submitted
10/05/2026 3:47 PM
Person filling out form
Barry Sampson
Foreman on the job
Barry Sampson
2

Office notification

Date office notified
10/02/2026
Method of notification
Cell
Who was contacted
Orry Wiechman
3

Utilities hit

Location of utility hit
Kandiyohi and 4th intersection NE corner
GasCenterpoint energy
Utility type
Gas
Utility company
Centerpoint energy
Utility notified
Yes
Company arrived onsite
Yes
GSOC #
261800801
Most recent locate
09/29/2026
How it was marked
Paint, Flag
Marks accurate or off
Accurate
4

What happened

Summary of incident
Pulling out old catch basin. Gas was right alongside,touching gas line. There were some dents and pitting that occurred. They came out on Monday, had to weld sleeve on it.
Are we at fault?
No
Why?
Shouldn’t have been touching catch basin
Utility said we are NOT responsible?
No
5

Pictures (4)

4 taken by Barry Sampson

Incident photo 1
DownloadPhoto 1 — uploaded 10/05/2026 3:43 PM · camera file dated 10/05/2026 3:43 PM
Incident photo 2
DownloadPhoto 2 — uploaded 10/05/2026 3:43 PM · camera file dated 10/05/2026 3:43 PM
Incident photo 3
DownloadPhoto 3 — uploaded 10/05/2026 3:44 PM · camera file dated 10/05/2026 3:44 PM
Incident photo 4
DownloadPhoto 4 — uploaded 10/05/2026 3:44 PM · camera file dated 10/05/2026 3:44 PM
6

Signature

Signature

Signed by Barry Sampson on 10/05/2026