Ryan ContractingUtility Hit Report

← All reports

UH-20260929-L8OT

#1160 - Willmar · 09/29/2026 at 7:20 AM · South west corner of grace

OpenElectricAt fault: Yes
Claim statusOpenRequestedNot recordedSettledNot settledOffice sign-in to update
1

Job & timing

Job number
#1160 - Willmar
Date of damage
09/29/2026
Time of damage
7:20 AM
Form filled out
09/29/2026
Submitted
09/29/2026 3:02 PM
Person filling out form
Bronson Seifert
Foreman on the job
Bronson Seifert
2

Office notification

Date office notified
09/29/2026
Method of notification
Cell
Who was contacted
Orry Wiechman
3

Utilities hit

Location of utility hit
South west corner of grace
ElectricWillmar utilities
Utility type
Electric
Utility company
Willmar utilities
Utility notified
Yes
Company arrived onsite
Yes
GSOC #
—
Most recent locate
09/28/2026
How it was marked
Paint
Marks accurate or off
No
4

What happened

Summary of incident
Installing telephone conduit for bolt on Menk sliver pot hold found 3 wires thought it was the power turns out it wasn’t it was farther back
Are we at fault?
Yes
Why?
Marks were close talked with Ory said we’re not paying for it since we put the conduit in talk with him
Utility said we are NOT responsible?
No
5

Pictures (4)

4 taken by Bronson Seifert

Incident photo 1
DownloadPhoto 1 — uploaded 09/29/2026 3:02 PM · camera file dated 09/29/2026 7:42 AM
Incident photo 2
DownloadPhoto 2 — uploaded 09/29/2026 3:02 PM · camera file dated 09/29/2026 7:42 AM
Incident photo 3
DownloadPhoto 3 — uploaded 09/29/2026 3:02 PM · camera file dated 09/29/2026 7:42 AM
Incident photo 4
DownloadPhoto 4 — uploaded 09/29/2026 3:02 PM · camera file dated 09/29/2026 7:42 AM
6

Signature

Signature

Signed by Bronson Seifert on 09/29/2026

7

Claim history

Every status change, newest first.